In-SITE: Farmhouse- Breaking Ground

2014-04-29 23.01.02We are thrilled to break ground on the Farmhouse project. Due to the late frost we had to delay digging our foundation until mid-April. We are excited to be working with Duneland Fine Homes. Take a peak at our photo documention where we broke ground and put in the forms and poured concrete to make our foundation walls.

-Linc Thelen

digging foundation

farmhouse concept drawing

Concept Drawing

\CPU07cad011. PROJECTSRoyal 46207 Grand BeachCADDRoyalGran

North Elevation

Site plan

Site Plan

2014-04-29 23.07.29

That’s me in the backhoe. I’m a very safe driver.

Next steps:
Form walls
Pour walls
Strip forms
Spray waterproofing on walls
Back fill foundation
Install septic system
Water tap from street into crawlspace
Install plumbing drains in crawl space floor
Pour crawl space floor

Meeting with electric company tomorrow at site to discuss permanent underground service. GOAL: NO POLES ON THE PROPERTY!

photo 2 photo 3 photo 1

walls poured 1

Foundation wall forms

walls poured 2

IMG_8233

Foundation walls poured

IMG_983